Villacé y Cominges
  • Home
  • Projects
  • Studio
  • Contact
  • Menu Menu
PreviousNext
123

BOSCH COMMUNICATION CENTER

  • Memory
  • Plans
  • Renders
  • Images

Vigo (2015-6)

The project develops the transformation of an industrial space in a Communications Center for the Bosch group. The biggest challenge is to get a working place of the highest quality in a densely occupied environment, maintaining the generosity of the building original proportions.

Those functions that need privacy are grouped around the existing core of communications, with access and training zones before them and the open platform area behind.

We build a system of upper drawers that bring light and fresh air to each work station, while acting as an acoustic absorber, and a system of recessed floor canals that conduct communications and electrical outlets.

This solution allows an optimum degree of flexibility to be achieved with the high performance required, within an environment of spaciousness and tranquility.

PLANS

RENDERS

IMAGES

© Copyright - Villacé y Cominges
  • Privacy Policy
  • Legal Notice
  • Contact
  • Español
  • English
TWO HOUSES IN “EL CASCO VELLO”MARQUÉS DE VALLADARES 39-41
Scroll to top